Fremont, California
Model 3 and Model Y. The S/X lines (100K/yr) ended in May 2026 and were converted in 46 days into the first Optimus line, rated at 1M robots a year.

Six Gigafactories, three Megafactories, a chip fab and a robot line where the Model S used to be.
Model 3 and Model Y. The S/X lines (100K/yr) ended in May 2026 and were converted in 46 days into the first Optimus line, rated at 1M robots a year.
Cells, powertrains and the dedicated Semi factory (50K/yr, producing since April 2026). A second Semi factory has started in Reno.
Supercharger V4 cabinets. Former Dojo site; a $500M non-Dojo supercomputer is still planned.
Model 3 and Y for China and export — exports covered weak domestic retail in 2026. Megafactory for Megapacks since 2025.
Model Y for Europe, where it is the #1 BEV. Tesla applied for expansion permits in October 2026.
HQ. Model Y, Cybertruck, Cybercab (>125K/yr installed), 4680 cells, the second Optimus factory (10M/yr target) under construction, and the Terafab prototype fab.
~40 GWh, 50 GWh and ~40 GWh a year of Megapacks respectively. Brookshire went from groundbreaking to production in 16 months.
The full-scale chip plant on the Gibbons Creek power-station site; construction from December 1, 2026.
Read about TerafabAnnounced March 2023 at ~$10B, paused July 2024 pending tariffs and the US election. No restart reported through October 2026; not formally cancelled.